Subject:
|
Re: Scheduled downtime 18 Jan 2001 for memory upgrade
|
Newsgroups:
|
lugnet.admin.general
|
Date:
|
Tue, 16 Jan 2001 19:53:17 GMT
|
Viewed:
|
440 times
|
| |
| |
todd,
i am an experienced I.T. person. I've done everything
one can do in I.T. actually (architect, engineer,
webdesign, programming, admin, etc etc ). I used
to run nortel.com
I'd really love to be able to assist w/ lugnet
plz let me know if there's anything i can do to help
thx much
-paul
--- Todd Lehman <lehman@javanet.com> wrote:
> On Thursday, 18 Jan 2001 at approximately 5:00 pm EST,
> lugnet.com will go
> offline briefly for a memory upgrade (adding another 640
> MB of DRAM). This
> will involve shutting down the webservers and newsserver
> and physically
> powering down the machine. Downtime should be about 15
> minutes.
>
> --Todd
|
|
1 Message in This Thread:
- Entire Thread on One Page:
- Nested:
All | Brief | Compact | Dots
Linear:
All | Brief | Compact
|
|
|
|