 | | Re: AAARRGHH !
|
|
Giuliano ha scritto: (...) Però i motori 9V, i trasformatori, i binari e gli RCX, sì... :P (...) (19 years ago, 6-Sep-07, to lugnet.org.it)
|
| |
 | | Re: AAARRGHH !
|
|
samurai74 ha scritto: (...) Ecco cosa succede a scegliere elettricisti economici ;-)) MA i Lego non patiscono l'acqua! Ti ho scritto in privato per le basi stradali. Hai ricevuto? GIuliano (19 years ago, 6-Sep-07, to lugnet.org.it)
|
| |
 | | AAARRGHH !
|
|
L'elettricista, sistemando il telefono mi ha forato un tubo del riscaldamento ! La mia "creation room" e' allagata ! ...Panico ! Devo ancora finire 2 moc per Torino e verro' presto accusato per elettricisticidio ! Dino Baldi (19 years ago, 6-Sep-07, to lugnet.org.it)
|
| |
 | | Re: NXT-G/ROBOTC Firmware Scheduler and Clump Priority
|
|
Wow! Very interesting posting. Thanks for revealing that, Dick! Zitat von Dick Swan <dickswan@sbcglobal.net>: (...) ---...--- This message was sent using IMP, the Internet Messaging Program. (19 years ago, 6-Sep-07, to lugnet.robotics.nxt)
|
| |
 | | NXT-G/ROBOTC Firmware Scheduler and Clump Priority
|
|
In a typical operating system (OS), tasks are scheduled on a priority basis. The highest priority task always executes ahead of lower priority tasks. If there are multiple tasks at the highest priority, then they are typically executed in a round (...) (19 years ago, 6-Sep-07, to lugnet.robotics.nxt)
|
| |
 | | Re: LDraw File Format Spec 1.0 DRAFT - Call for Public Comments
|
|
The LSC would like to thank everyone for their comments on the draft specification so far. The three week period for comments will end Monday 10th September. William Howard On behalf of the 2006/7 LSC (19 years ago, 6-Sep-07, to lugnet.cad)
|
| |
 | | RE: Ooops! NXT Software Comparison correction
|
|
(...) After tuning, NBC achieved 73K test cycles. It achieved these great results by setting the task "priority" to 200. Unfortunately, unless the NXT-G task scheduler has been rewritten, these results might be a little too high. A NXT-G task (or (...) (19 years ago, 6-Sep-07, to lugnet.robotics.nxt)
|
| |
 | | RE: Ooops! NXT Software Comparison correction / I2C Messaging Speed
|
|
(...) Nobody cheated or is dishonest. Everyone who writes firmware for the NXT is well-intentioned "good" people. Let's not mislabel good modern programming practice -- i.e. hardware device drivers integrated into the low-level firmware -- as (...) (19 years ago, 6-Sep-07, to lugnet.robotics.nxt)
|
| |
 | | peeron inventory corrections
|
|
1876-1: Soil Scooper 4265a OldGray Technic Bush 1/2 Type I should be 3 not 2 3066 Clear Brick 1 x 4 without Centre Studs should be with center studs, early sets may have had the one without studs, but I doubt it. 3024 TrYellow Plate 1 x 1 should be (...) (19 years ago, 6-Sep-07, to lugnet.inv)
|
| |
 | | Re: Warehouse district - sneak progress shots
|
|
(...) at first glance it didn't appear to be made out of Lego... Spencer (19 years ago, 6-Sep-07, to lugnet.town, FTX)
|